Purelines > Projects > Network Rehabilitation Program – Mainland 7 (Abu Dhabi)
PHOTO-2026-04-22-10-00-41

Network Rehabilitation Program – Mainland 7 (Abu Dhabi)

Project Description

This urban sewer network suffered from high infiltration during seasonal groundwater rise, combined with salinity contamination damaging concrete structures and affecting plant efficiency.

Client: TAQA Water Solutions
Project No.: O-15213
Location: Mohammed Bin Zayed (MBZ) City
Consultant: Dorsch Gruppe

Challenge:

  • Infiltration mainly through pipeline joints spread over a large residential area

  • Traditional open-cut repairs would require road closure permits, diversions, and cause major disruption to residents

PHOTO-2025-06-25-18-18-52

Solution & Result:

Through targeted CCTV inspections and precise gel grouting at leaking joints, all infiltration points were sealed without surface disturbance. Post-rehabilitation monitoring confirmed complete elimination of saline water ingress, restoring network integrity and extending service life.

Trenchless Sewer Solutions !!! Without the Mess