Purelines > Projects > Network Rehabilitation – Miscellaneous Projects (Abu Dhabi City – Part 2)
PHOTO-2026-04-24-08-24-02

Network Rehabilitation – Miscellaneous Projects (Abu Dhabi City – Part 2)

Project Description

The network experienced localized infiltration at manhole connections and joint defects, leading to elevated salinity at the treatment plant.

Client: TAQA Water Solutions
Project No.: O-15397
Location: MBZ City
Consultant: Stantec

Challenge:

  • Restricted access in high-traffic areas

  • Open-cut repairs would have meant major road excavation, traffic disruption, and long reinstatement periods

PHOTO-2026-04-30-08-34-37

Solution & Result:

Gel grouting was applied internally at the source of infiltration. Its flexibility and durability ensured a long-term watertight seal, completely mitigating saline ingress without disturbing surface infrastructure.

Trenchless Sewer Solutions !!! Without the Mess

Contact Us