
Network Rehabilitation – Miscellaneous Projects (Abu Dhabi City – Part 2)
Project Description
The network experienced localized infiltration at manhole connections and joint defects, leading to elevated salinity at the treatment plant.
Client: TAQA Water Solutions
Project No.: O-15397
Location: MBZ City
Consultant: Stantec
Challenge:
-
Restricted access in high-traffic areas
-
Open-cut repairs would have meant major road excavation, traffic disruption, and long reinstatement periods

Solution & Result:
Gel grouting was applied internally at the source of infiltration. Its flexibility and durability ensured a long-term watertight seal, completely mitigating saline ingress without disturbing surface infrastructure.